It is expected that the first of the new National Certificate qualifications
will be registered on the NZQA web site on the 16th of January 2008.
All new trainees will then enter their training at this point.
The Elementary Scaffolding Certificate will be a pre-requisite for the
Intermediate Certificate which will be registered shortly.
The content of the Elementary Scaffolding Certificate is listed below.
|
Unit nos. |
Unit Standard |
1 |
|
|
|
|
Core Generic unit standards |
|
497 |
Demonstrate knowledge of workplace health and safety requirements (1) v7 |
3 |
|
|
|
|
6400 |
Manage First Aid in emergency situation (3) v3 |
2 |
|
|
|
|
6401 |
Provide basic First Aid (2) v3 |
1 |
|
|
|
|
6402 |
Provide basic life support (1) v5 |
1 |
|
|
|
|
1277 |
Communicate information in a specified workplace (2) v4 |
3 |
|
|
|
|
15757 |
Employ fall arrest systems on construction sites (3) v1 |
4 |
|
|
|
|
5228 |
Take measurements & use calculations to solve measurement problems (1)
v4 |
3 |
|
|
|
|
8489 |
Solve problems calculating whole numbers (1) v3 |
2 |
|
|
|
|
1753 |
Load and unload goods service vehicle (2) v4 |
4 |
|
|
|
|
3789 |
Sling regular loads and communicate during crane operations (3) v5 |
22 |
|
|
|
|
19620 |
Interpret & apply scaffold HSE legislative requirements (3) v2 |
3 |
|
|
|
|
19621 |
Interpret & apply legislative requirements in the design of scaffolding
works (3) v2 |
3 |
|
|
|
|
19622 |
Use & maintain scaffolding hand & power tools (3) v2 |
4 |
|
|
|
|
Elementary Scaffolding unit standards |
|
20855 |
Handle and maintain scaffolding components (2) v 2 |
5 |
|
|
|
|
20856 |
Plan and prepare for the erection of a scaffold (3) v2 |
5 |
|
|
|
|
20857 |
Prepare a scaffolding site for the basing out of scaffolding (3) v2 |
5 |
|
|
|
|
20858 |
Base out tube and fitting scaffolding (3) v2 |
12 |
|
|
|
|
20859 |
Base out proprietary frame scaffolding (3) v2 |
4 |
|
|
|
|
20860 |
Base out individual component proprietary scaffolding (3) v2 |
6 |
|
|
|
|
20861 |
Demonstrate, at height, safety procedures for the erection of
scaffolding 3 |
6 |
|
|
|
|
20862 |
Demonstrate, at height, safety procedures for the dismantling of
scaffolding 3 |
6 |
|
|
|
|
23223 |
Base out returns for tube & fitting scaffolding (3) v2 |
12 |
|
|
|
|
19623 |
Use tube and coupler in standing proprietary scaffolds (3) |
8 |
|
|
|
|
23224 |
Erect and dismantle standing tube and fitting scaffolding (3) v2 |
12 |
|
|
|
|
23225 |
Erect and dismantle mobile scaffolding (3) v2 |
12 |
|
|
|
|
23226 |
Erect and dismantle elementary falsework (3) v2 |
12 |
|
|
|
|
23227 |
Erect and dismantle standing proprietary scaffolding (3) v2 |
12 |
|
|
|
|
23228 |
Complete a scaffolding inspection compliance report (3) v2 |
4 |
|
|
|
|
23715 |
Design construct and dismantle scaffolding ties 4 |